No load shedding
National stage from Eskom's public status feed, checked at 00:08 SAST and refreshed every 15 minutes. Your area may differ.
Where things stand
Eskom has not implemented national load shedding since May 2025, and winter 2026 passed without it. Some areas still have load reduction at peak times, and local outages from cable theft, storms and overloaded substations still happen, especially in parts of Johannesburg. Those are faults: report them to your supplier.
Source: Eskom statements, October 2026.
What the stages mean
Eskom declares a national stage when supply cannot meet demand. Each stage takes about 1,000 MW more off the grid, and the number of cuts on your schedule rises roughly in step. Cuts usually last 2 or 4 hours, depending on your supplier.
1,000 MW
About 3 cuts over 4 days, usually 2 hours each.
2,000 MW
About 2 times as many cuts as Stage 1.
3,000 MW
About 3 times as many cuts as Stage 1.
4,000 MW
About 4 times as many cuts as Stage 1.
5,000 MW
About 5 times as many cuts as Stage 1.
6,000 MW
About 6 times as many cuts as Stage 1.
7,000 MW
About 7 times as many cuts as Stage 1.
8,000 MW
About 8 times as many cuts as Stage 1.
Source: Eskom load shedding explainer. Exact slot counts and lengths depend on your supplier's schedule.
Find your block
Your schedule depends on who supplies your electricity. Check your bill or prepaid receipt: if it comes from the municipality, use the city's schedule; if it comes from Eskom, use Eskom's. The EskomSePush app combines both and sends alerts.
Eskom (direct customers)
Search your suburb on Eskom's load shedding site for its block and schedule. Use it if your bill or prepaid token comes from Eskom.
Official siteCity Power (Johannesburg)
City Power switches its own areas in Johannesburg and publishes its own blocks and schedule. Parts of Soweto, Sandton and Midrand are Eskom direct instead.
Official siteCity of Cape Town
Cape Town runs its own schedule and can protect its customers by one or more stages using the Steenbras hydro scheme, so its stage can be lower than the national one.
Official siteCity of Tshwane
Tshwane publishes its blocks and schedule on its website and social media.
Official siteeThekwini (Durban)
eThekwini publishes schedules by area on the municipal website.
Official siteCity of Ekurhuleni
Ekurhuleni lists its own load shedding blocks and outage notices.
Official siteWhat to do in a cut
Inverter and battery
A small inverter and lithium battery keeps Wi-Fi, lights and the TV running; a UPS covers just the router. Use a registered installer and get a certificate of compliance.
Gas for cooking
A gas stove or braai means hot food in a cut. Keep cylinders outside or in a ventilated space, and have them filled at a reputable dealer.
Alarms, fences and gates
Check the backup batteries on your alarm, electric fence and gate motor, and learn how to open the gate by hand. Crime can rise during cuts.
Traffic lights
When lights are out, treat the intersection as a four-way stop: the first car to arrive goes first. Expect pointsmen at busy junctions and slower traffic.
Phones and signal
Keep a power bank charged. Mobile towers have batteries, but signal can drop in long cuts, so save emergency numbers offline.
Water
Some areas lose water pressure in long cuts because pumps stop. Keep a few litres of drinking water at home.
Fridge and freezer
Keep doors shut during a cut; a full freezer holds for about a day. Switch appliances off at the wall to avoid surges when the power returns.
Lights
Rechargeable LED lamps and head torches are safer than candles.
Water outages and restrictions
Water cuts usually come from pipe bursts, maintenance on bulk supply or pumps that stop in power cuts. Check your municipality's official page for planned work, restrictions and how to report a leak.
Johannesburg Water
Planned maintenance, outages and water restrictions in Johannesburg.
Official siteRand Water
The bulk supplier to Gauteng: maintenance on its pipelines and reservoirs causes the biggest outages.
Official siteCity of Cape Town water and sanitation
Water restrictions, dam levels and service alerts in Cape Town.
Official siteCity of Tshwane
Water outages and restrictions in Pretoria and surrounds.
Official siteeThekwini Water and Sanitation
Outages and repairs in Durban.
Official siteCity of Ekurhuleni
Water outage notices in Ekurhuleni.
Official siteLoad shedding FAQ
Is there load shedding today?
Eskom reports no load shedding at the moment. Local faults and load reduction can still cut power in some areas.
What does each load shedding stage mean?
Each stage removes about 1,000 MW more from the national grid, so Stage 2 means roughly twice as many cuts on your schedule as Stage 1, and Stage 8 about eight times as many. Cuts usually last 2 or 4 hours each.
How do I find my load shedding block?
First check who supplies your power: your municipality (for example City Power, Cape Town, Tshwane or eThekwini) or Eskom directly. Then search your suburb on that supplier's website or in the EskomSePush app.
What is load reduction?
Load reduction is a local cut by Eskom in areas where the network is overloaded, often by illegal connections. It is not part of the national stages and usually happens in the morning and evening peaks.